Sprint Retrospective Time Min
Computes recommended sprint retrospective duration in minutes based on team size and sprint length.
resultado
—
Sprint retrospective: time-boxing the inspection
The Sprint Retrospective closes out the sprint. It's where the Scrum Team looks back at how the last iteration went across people, interactions, processes and tools, then settles on what to improve. The Scrum Guide 2020 caps it at three hours for a one-month sprint, which puts the standard time-box for a two-week sprint at 1.5 hours. This estimator scales that proportionally, total_min = semanas × 45, and nudges the figure up by team size once conversation overhead starts to matter.
Common formats include Start-Stop-Continue, 4Ls (Liked, Learned, Lacked, Longed for), Sailboat (anchors, winds, rocks, island) and Mad-Sad-Glad. Catalogs like Retromat and the Liberating Structures repertoire give you ways to mix up the dynamic so the team doesn't slide into one repetitive ritual. Behind it all sits the Japanese idea of kaizen, or continuous improvement.
Applications
Scrum Masters reach for this calculator when blocking the right calendar slot to invite the team. Agile coaches use it while planning a Retrospective of Retrospectives (RoR) in scaled frameworks such as SAFe and LeSS. And engineering managers use it to budget non-delivery time during capacity planning.
FAQ
Can the retrospective be shorter than 1.5h? Yes. The Scrum Guide caps the duration but never sets a minimum. Small teams of 3–4 people often wrap up in 45–60 minutes. Go much lower than that and you start risking the action-item step getting skipped.
How many action items should we leave with? One to three concrete improvements works best. Pile on more and the team usually fails to land any of them in the next sprint.
Should we invite the Product Owner? Yes. The Scrum Guide 2020 treats the PO as part of the Scrum Team, so participation is expected unless the team explicitly agrees on a different setup.
Related Tools
Sprint Review Time Min
Computes recommended sprint review duration in minutes from sprint length per Scrum guide.
Sprint Planning Time Hours
Computes sprint planning duration in hours based on sprint length per Scrum guide.
Daily Standup per Person Min
Estimates recommended daily standup minutes summing speaking time per team member, capped at 15.
Yoga Time per Person and Type in Minutes
Estimates yoga practice time in minutes per session by level and type.
Weekly HIIT Time Calculator
Find out how many minutes of HIIT training per week are recommended for your profile. Plan the frequency and duration of your interval workouts.
Astrophoto Tracking Exposure Time Min
Estimates total astrophoto exposure minutes in a tracked session from number of subs.
The results provided by this tool are for general informational and educational purposes only and do not constitute professional, financial, medical, legal, tax or accounting advice. Always confirm important decisions with a qualified professional and official sources.